Fred
- Nov 30, 2016
Under the floorboards
I'm back inside now and working on the dust collection ducting under the floor. As planned, I can remove a section of the floor in about 3 minutes and I am able to put it back down in about 4 minutes. It's important that when I pull up a section that I label where it was and how it was oriented. These are 4 foot by 4 foot sections in theory only. Each piece of plywood was individually shaped to fit in its spot and will not fit any other way. No biggie, just some admin I


Fred
- Nov 22, 2016
Time to move the work back inside.
The dust collection lean-to is finished! Though this was not a complicated project, it did challenge me to look up some stuff on YouTube that I just had never done before. This was the first time I had put on a roof and installed roofing material and shingles. It wasn't too crazy complicated, but it was a big job that took a fair amount of concentration on a pretty steep and high roof. I can see why roofers get paid so much. Also, those doors are HEAVY. When I decided to